Every procedure and all calculation possibilities of German EnEV 2007 and DIN V 18599 (energy saving regulation), monthly balance, period balance, procedures under public law, procedures for buildings with low inside temperatures and existing buildings.
• calculation of transmission heat losses using Fx-values, integration of thermal bridges, losses to the ground (including stationary or harmonious conductance), front buildings of glass
• explicite calculation of thermal bridges
• energy losses of integrated heating surfaces
• internal heat gains
• solar heat gains of windows, winter gardens, opaque structural units transparent heat insulation, radiation intensities and shading factors
• determination of the effective heat storage capacity
• calculation of heat and warm water requirements
• calculation of primary energy requirements and transmission energy losses, limiting values according to German EnEV 2001 / 2002
• graphical preparation: monthly or periodical balances, energy profiles
• comparison of two building and calculation varieties